Service difficulty report · Floor Support · Boeing 7378H4

Difficulty date
October 8, 2024
Submitted
October 29, 2024
Operation
Air carrier
Aircraft
N8513F
Make and model
Boeing 7378H4
Aircraft serial
36976
Aircraft time
26,605 hours, 13,201 cycles
Part
Floor Support
Condition
Cracked
Location
Zone 200
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CRACKED INTERCOSTAL AT FWD WET AREA BS391 BL0 WL208.<[01] ALL STEPS COMPLETED REMOVED INTERCOSTAL AT BS380-BS400 BL0 WL208 PER SRM 51-40-02-0G-0 LOCATED AND DRILLED NEW INTERCOSTAL AT FWD WET AREA BS391 BL0 WL208. PER SRM 51-40-05 AND BOE DWG 143A5400 SHEET 52 REV- INSTALLED NEW INTERCOSTAL AT BS380-BS400 BL0 WL208 PER SRM 51-40-02 AND BOE DWG 143A5400 SHEET 52 REV-.;[02] ALL STEPS COMPLETED VERIFIED THAT SRM 52-00-04-1A-1 IS APPLICABLE TO THIS AIRCRAFT. FOUND TO BE OUT OF LIMITS DUE TO NO REPAIR REFERENCE FOR CRACK AT FASTENER HOLES REPLACE PART. REMOVED INTERCOSTAL AT BS380-BS400 BL0 WL208 PER SRM 51-40-02-0G-0 LOCATED AND DRILLED NEW INTERCOSTAL AT FWD WET AREA BS391 BL0 WL208. PER SRM 51-40-05 AND BOE DWG 143A5400 SHEET 52 REV- INSTALLED NEW INTERCOSTAL AT BS380-BS400 BL0 WL208 PER SRM 51-40-02 AND BOE DWG 143A5400 SHEET 52 REV-.;[03] VERIFIED RII CORRECTIVE ACTION ITEM 1; CARD COMPLETE.

More about the Boeing 737-8H4