What was found
L/H A/C BAY; STA. 663 ANGLE TO VAPOR BARRIER CRACKED AT FASTENER HOLE LBL-9<[01] REMOVED DAMAGED SECTION OF ANGLE PER SRM 57-10-102R-5 & SRM51-10-02.;[02] ACCOMPLISHED HFEC HOLE PROBE AND SURFACE INSPECTION OF REPAIR AREA PER NDT PART 6 50-00-00 PROC. 16 AND 51-00-00 PROC. 23 NO DEFECTS NOTED. C/W INSPECTION OF CORRECTIVE ACTION STEP # 1 .;[03] FABRICATED REPAIR PARTS PER SRM 57-10-10-2R-5. ALODINE REPAIR PARTS PER AMM 51-21-41. PRIMED REPAIR PARTS PER AMM 51-21-72.;[04] RII INSP C/W; FABRICATED REPAIR PARTS PER SRM 57-10-10-2R-5. ALODINE REPAIR PARTS PER AMM 51-21-41. PRIMED REPAIR PARTS PER AMM 51-21-72.;[05] OK TO INSTALL;[06] REPAIRED L/H STA 663 VAPOR BARRIER ATTACH ANGLE AT LBL 15 PER SRM 57-10-10-2R-5;[07] C/W STEP #6;[08] RII C/W INSPECTION AS REQUIRED