What was found
R/H A/C BAY STA 663 ANGLE TO VAPOR BARRIER CRACKED AT FASTENER HOLE RBL 10<[01] REMOVED FASTENERS COMMON TO REPAIR AT STA 663 VAPOR BARRIER ATTACH ANGLE VERTICAL FLANGE IAW SRM 57-10-10-2R-5.;[02] CUT AND REMOVED DAMAGED PORTION OF R/H A/C BAY STA 663 ANGLE PER SRM 57-10-10-2R-5;[03] CA#- 2. JAMES LYNCH (TECHNICIAN); 07-NOV-2024 21:59 UTC<BR>CUT AND REMOVED DAMAGED PORTION OF R/H A/C BAY STA 663 ANGLE PER SRM 57-10-10-2R-5;[04] FABRICATED REPLACEMENT ANGLE PER SRM 57-10-10-2R-5;[05] CW INSP STEP 4.;[06] ACCOMPLISHED HFEC SURFACE AND HOLE PROBE INSPECTION OF REPAIR AREA NO DEFECTS NOTED. PER NDT PART 6 51-00-00 PROC. 23 AND 51-00-00 PROC. 16;[07] OK TO INSTALL REPAIR PARTS AND FASTENERS;[08] REPAIRED R/H A/C BAY STA 663 ANGLE TO VAPOR BARRIER IAW SRM 57-10-10-2R-5;[09] REPAIRED R/H A/C BAY STA 663 ANGLE TO VAPOR BARRIER IAW SRM 57-10-10-2R-5 AND EA M-EA M-24-157-02340 SEE ALL STEPS/CORRECTIONS FOR WORK PERFORMED;[10] RII INSPECTION PORTION COMPLIED WITH. SEE C/A?S AND STEPS FOR ALL WORK PERFORMED. REPAIRED R/H A/C BAY STA 663 ANGLE TO VAPOR BARRIER IAW SRM 57-10-10-2R-5 AND EA M-24-157-02340.