What was found
CRACKED FLOOR SUPPORT AT BS 393 RBL 8.283 WL 208 CRACKED FLOOR SUPPORT BETWEEN BS 380-400 RBL 8.283 WL 208<[01] STEP 3 RBL DOES NOT MATCH THE SIGNOFFS AND THERE IS NO OVERALL CORRECTIVE ACTION.;[02] REMOVED AND REPLACED WITH NEW FLOOR SUPPORT AT BS 393 RBL 13 WL 208 IAW SRM 51-40-05; BOEING DWG#143A5400 REV:-; SRM 51-40-02; SRM 53-00-04-1A-1;[03] REMOVED AND REPLACED WITH NEW FLOOR SUPPORT AT BS 380-400 RBL 8.283 WL 208 IAW SRM 51-40-05; BOEING DWG#143A5400 REV:-; SRM 51-40-02; SRM 53-00-04-1A-1;[04] CORRECTED RBL LOCATIONS ON STEPS;[05] VERIFIED CORRECTIVE ACTION 3