What was found
EXTERNAL POWER PLUG CUTOUT HAS A CRACK AT 6 O'CLOCK<[01] CUT AND REMOVED DAMAGE IN ZONE 2 PER SRM 53-10-15-2R-4;[02] PERFORMED VISUAL INSPECTION WITH 10X MAGNIFIER AND PERFORMED NDT PART 6 51-00-00 PROCEDURE 23 SURFACE INSPECTION ON CUT OUT AND INTERNAL SKIN; NO DEFECTS NOTED;[03] FABRICATED AND INSTALLED REPAIR PARTS PER SRM 53-10-15-2R-4 FIGURE 204. NO FURTHER ACTION REQUIRED.;[04] INSPECTION C/W FABRICATED AND INSTALLED REPAIR PARTS PER SRM 53-10-15-2R-4 FIGURE 204. NO FURTHER ACTION REQUIRED.;[05] INSPECTION C/W FABRICATED AND INSTALLED REPAIR PARTS PER SRM 53-10-15-2R-4 FIGURE 204. NO FURTHER ACTION REQUIRED.