What was found
STA 663 VAPOR BARRIER UPPER ATTACH ANGLE HAS CRACK AT RBL 11<[01] LOCATED AND DRILLED NEW ATTACH ANGLE PER SRM 51-40-02 / SRM 51-10-02. NEEDS OK TO INSTALL PART.;[02] COMPLIED WITH INSPECTION OF THE LOCATED AND DRILLED NEW ATTACH ANGLE FROM STOCK PER SRM 51-40-02 / SRM 51-10-02. OK TO INSTALL PART.;[03] INSTALLED FASTENERS COMMON TO FUEL TANK ON UPPER CHORD PER SRM 51-40-02.;[04] COMPLIED WITH INSPECTION OF THE INSTALLED FASTENERS COMMON TO FUEL TANK ON UPPER CHORD PER SRM 51-40-02. STEP 3;[05] REPLACED ATTACH ANGLE PER SRM 51-40-02/SRM 51-10-02.;[06] COMPLIED WITH CORRECTIVE ACTION #5. RII;[07] VERIFIED REPLACED ATTACH ANGLE PER SRM 51-40-02/SRM 51-10-02.RII IS C/W.;[08] REPLACED ATTACH ANGLE PER SRM 51-40-02/SRM 51-10-02.