What was found
LEFT HAND WING I/B MAIN FLAP TRAILING EDGE WEDGE HAS AREAS OF DELAMINATION ON LOWER SIDE.<[01] REMOVED DAMAGED T/E WEDGE PER SRM 51-40-02.;[02] LOCATED AND PICKED UP MOUNTING BOLT HOLES IN NEW WEDGE IAW SRM 51-40-02.;[03] INSPECTED WORK ACCOMPLISHED IN C/A #1. REMOVED DAMAGED T/E WEDGE PER SRM 51-40-02. LOCATED AND PICKED UP MOUNTING BOLT HOLES IN NEW WEDGE IAW SRM 51-40-02.;[04] MATCH DRILLED REMAINING FASTENER HOLES PER SRM 51-40-02. INSTALLED NUTPLATES PER SRM 51-40-10;[05] INSPECTED THE WORK PERFORMED ON CORRECTIVE ACTION #4; NO DEFECTS NOTED.;[06] OK TO INSTALL NEW WEDGE;[07] INSTALLED REPLACEMENT WEDGE PER SRM 51-40-02;[08] C/W RII INSPECTION