What was found
CRACK IN RIGHT WHEEL WELL VAPOR BARRIER OF 11 INCHES AT STATION RBL 32.0 TO RBL 54.0 <[01] 01. - REMOVED AND REPLACED PER [SRM 57-10-10-1A-2-A00592 (CRACK - STOP DRILL AND SEAL - DVI EVERY 1200 CYC - INTERIM REPAIR)].
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CRACK IN RIGHT WHEEL WELL VAPOR BARRIER OF 11 INCHES AT STATION RBL 32.0 TO RBL 54.0 <[01] 01. - REMOVED AND REPLACED PER [SRM 57-10-10-1A-2-A00592 (CRACK - STOP DRILL AND SEAL - DVI EVERY 1200 CYC - INTERIM REPAIR)].