What was found
CUSTOMER REQUEST - DEBONDED IB MAIN FLAP TRAILING EDGE WEDGE PANEL AT LT WING 2025-139096<[01] TOOL USED CALIPER PN: 500-464; SN: B17030933; DUE DATE: 21/DEC/25.;[02] TOOL USED ON STEP 3: BONDTESTING UNIT; P/N: BONDMASTER 600M; S/N:220052310; CAL DUE DATE: 04-DEC-25;[03] TOOL USED: BOND TESTING UNIT; P/N: BONDMASTER 600M; S/N:220052310; CAL DUE DATE: 04-DEC-25;[04] PERFORMED INTERIM REPAIR ON I/B MAIN FLAP TRAILING EDGE WEDGE PANEL AT LT WING IAW B737-800 SRM 57-53-01-2R-18 REPAIR 18. SEE INDIVIDUAL SIGNOFFS BELOW;[05] JOB TASK COMPLETED. RII INSPECTION COMPLETED.