What was found
R/H VAPOR BARRIER ATTACH ANGLE IS CRACKED STA 663 RBL 8 AND 30. REMOVED FASTENERS IN FUEL TANK ONLY OF R/H VAPOR BARRIER ATTACH ANGLE PER SRM 51-40-02. REMOVED DAMAGED R/H VAPOR BARRIER ATTACH ANGLE FROM APPROXIMATELY RBL 5' TO RBL 62' PER SRM 51-40-02. LOCATED AND DRILLED NEW RH VAPOR BARRIER ATTACH ANGLE PER SRM 51-40-05. INSTALLED FASTENERS COMMON TO THE VAPOR BARRIER ATTACH ANGLE AND CENTER FUEL TANK ONLY FROM APPROXIMATELY RBL 5' TO RBL 62' PER SRM 51-40-02. INSTALLED FASTENERS COMMON TO THE VAPOR BARRIER ATTACH ANGLE AND CENTER FUEL TANK ONLY FROM APPROXIMATELY RBL 5' TO RBL 62' PER SRM 51-40-02. INSTALLED RIVETS ONLY IN VAPOR BARRIER ATTACH ANGLE VERTICAL LEG PER SRM 51-40-02 AND EA M-24-157-02340. INSPECTION AS REQUIRED. INSTALLED REMAINING FASTENERS IN VAPOR BARRIER ATTACH ANGLE VERTICAL LEG PER SRM 51-40-02. INSTALLED REMAINING FASTENERS IN VAPOR BARRIER ATTACH ANGLE VERTICAL LEG PER SRM 51-40-02. CAP SEALED FASTENERS COMMON TO THE VAPOR BARRIER ATTACH ANGLE AND CENTER FUEL TANK ONLY FROM APPROXIMATELY RBL 5' TO RBL 62' PER SRM 51-80-01. REMOVED AND REPLACED R/H VAPOR BARRIER ATTACH ANGLE AT STA 663. PER SRM 51-40-02 AND EA M-24-157-02340.