What was found
L/H VAPOR BARRIER ATTACH ANGLE IS CRACKED STA 663 LBL 8. REMOVED FASTENERS IN FUEL TANK ONLY OF L/H VAPOR BARRIER ATTACH ANGLE PER SRM 51-40-02;[02] CUT AND REMOVED DAMAGED SECTION OF ANGLE PER SRM 57-10-10-2R-5. C/W HFEC OPEN HOLE PROBE INSPECTION OF ALL EXISTING FASTENER HOLES PER NDT MANUAL PART 6; 51-00-00 PROCEDURE 16. FOUND ONE HOLE BAD; SEE FAULT # TTG8QOOZMGGN. FORMED SPLICE ANGLE IAW SRM 57-10-10-2R-5. LOCATED, DRILLED, AND TRIMMED SPLICE ANGLE PER SRM 57-10-10-2R-5. ] OBTAINED PREFABRICATED REPLACEMENT VAPOR BARRIER ATTACH ANGLE FROM STORES. CUT; LOCATED; AND DRILLED REPLACEMENT ANGLE FROM PREFABRICATED PART; FROM APPROXIMATELY LBL 6' TO LBL 17' AT STA. 663 PER SRM 57-10-10-2R-5. TREATED AND PRIMED REPAIR PARTS PER SRM 51-20-01 AND SOPM 20-41-02.