What was found
LH INBD MAIN FLAP TE WEDGE IS DELAMINATED. LOCATED AND DRILLED NEW -603 WEDGE ASSY PER SRM 51-40-02; TREATED AND PRIMED BARE METAL PER SRM 51-20-01. APPLIED TOPCOAT PER AMM 51-21-99. INSTALLED NUT PLATES PER SRM 51-40-02
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LH INBD MAIN FLAP TE WEDGE IS DELAMINATED. LOCATED AND DRILLED NEW -603 WEDGE ASSY PER SRM 51-40-02; TREATED AND PRIMED BARE METAL PER SRM 51-20-01. APPLIED TOPCOAT PER AMM 51-21-99. INSTALLED NUT PLATES PER SRM 51-40-02