What was found
FOUND SEVERAL AREAS OF CORROSION IN FWD CARGO BAY ON THE SIDEPLATE SUPPORT ZEE FROM STATION 500C TO 500H. COMPLIED WITH SRM 53-00-53-2 REPAIR 5 UP TO AND INCLUDING STEP 4J. PERFORMED HOLE PROBE OF EXISTING FASTENER HOLES PER NDT PART 6 51-00-00 PROCEDURE 16. REMOVED AND REPLACED A CHANNEL SIDEPLATE FROM STA.500B +10 TO 500G +10 PER SRM 51-40-02 AND 53-00-53-2R-5 REPAIR FIVE FOR SPLICES. SPLICES LOCATED BETWEEN STA. 500B & 500C; SECOND SPLICE BETWEEN 500G & 500H.