What was found
CRACK FOUND AT L/H BS 663 VAPOR BARRIER UPPER ATTACH ANGLE AT LBL 9<[01] FABRICATED REPAIR PARTS PER SRM 57-10-10-2R-5. NEED OK TO INSTALL PARTS.;[02] REMOVED R/H A/C DISTRIBUTION DUCTING F.O.M.;[03] C/W RII INSPECTION OF C/A #1;[04] INSTALLED REPAIR PER SRM 57-10-10-2R-5;[05] VERIFIED FASTENERS INSIDE CENTER TANK PRIOR TO CAP SEALING PER SRM 57-10-10-2R-5.;[06] SEE TASK CARD TTG8Q010QRES FOR C/A # 2 SING OFF.;[07] LINE #4 & #5<BR>INSPECTED AS REQUIRED;[08] LINE #4 & #6<BR>INSPECTED AS REQUIRED;[09] TASK CARD COMPLETE SEE ADDITIONAL STEPS FOR WORK ACCOMPLISHED<BR>INSPECTED AS REQUIRED