What was found
CRACKS FOUND AT BS 663 VAPOR BARRIER UPPER ATTACH ANGLE RBL 9 & 32.<[01] MATCH DRILLED BS 663 VAPOR BARRIER UPPER ATTACH ANGLE PER SRM 51-40-02 & DWG 111A1000. NEED OK TO INSTALL ANGLE.;[02] REMOVED 663 VAPOR BARRIER ANGLE PER SRM 51-40-02.;[03] C/W RII INSPECTION OF CA #1;[04] INSTALLED FASTENERS COMMON TO FUEL TANK PER SRM 51-40-02 & DWG 111A1000.;[05] C/W INSPECTION OF C/A #4; INSTALLED FASTENERS COMMON TO FUEL TANK PER SRM 51-40-02 & DWG 111A1000.;[06] REPLACED R/H BS 663 VAPOR BARRIER UPPER ATTACH ANGLE PER SRM 51-40-02 & DWG # 111A1000.;[07] C/W RII INSPECTION OF C/A #6;[08] CHANGED RII MEASUREMENT FROM NO TO YES;[09] ALL RII INSPECTION COMPLETED