What was found
R/H BS 663 VAPOR BARRIER UPPER ATTACH ANGLE CRACKED AT RBL 34. FABRICATED & MATCH DRILLED REPAIR PARTS PER SRM 57-10-10-2R-5. INITIAL AREA AND FASTENER HOLES REQUIRE NDT & GVI.;[03] PERFORMED NDT PER BOEING 51-00-00 PART 6. PROCEDURE 16 WITH NO DEFECT NOTED. PERFORMED GVI INSPECTION OF FASTENERS HOLES AND FOUND NO DEFECT. INSTALLED FASTENERS COMMON TO FUEL TANK PER SRM 51-40-02 & DWG 111A1000. REMOVED CRACKED PORTION OF ANGLE PER SRM 51-10-02. INSTALLED REMAINING REPAIR FASTENERS PER SRM 57-0-10-2R-5. C/W RII INSPECTION OF C/A #6;7;AND 8. VERIFIED DOME SEALED FASTENERS IAW AMM 51-31-00.