What was found
CRACK FOUND BS 663 VAPOR BARRIER ATTACH ANGLE APPROX LBL 9. REMOVED VERTICAL FASTENERS ON LT BS 663 ANGLE FROM LBL 8 TO LBL 24 IAW SRM 57-10-10-2R-5. REPAIR 5. REMOVED FUEL TANK FASTENERS FROM VAPOR BARRIER ATTACH ANGLE PER SRM 57-10-10-2R-5 REPAIR 5. 1 AND 2 ACCOMPLISHED PER SRM 57-10-10-2R-5 REPAIR 5. PERFORMED AN OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION FOR ALL INITIAL FASTENER HOLES IN THE REPAIR AREA. REFER TO NDT PART 6; 51-00-00; PROCEDURE 16. NO DEFECTS NOTED. PERFORMED INITIAL CUT OF VAPOR BARRIER ATTACH ANGLE PER SRM 57-10-10-2R-5. REPAIRED BS 663 VAPOR BARRIER ATTACH ANGLE IAW SRM 57-10-10-2R-5 AND EA M-24-157-02340.