What was found
RIGHT VAPOR BARRIER ATTACH ANGLE CRACKED AT RBL 9; BS 663. REMOVED 11 TANK FASTENERS COMMON TO THE BS 663 VAPOR BARRIER ATTACH ANGLE REPAIR, PERFORMED AN OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION FOR ALL INITIAL TANK FASTENER HOLES IAW NDT PART 6, 51-00-00, PROCEDURE 16. NO DEFECTS NOTED. REMOVED DAMAGED SECTION OF ATTACH ANGLE IAW SRM 57-10-10-2R-5. PERFORMED DETAILED VISUAL AND OPEN HOLE HFEC INSP FOR ALL FASTENER HOLES IAW NDT PART 6; 51-00-00, PROCEDURE 16. NO DEFECTS NOTED. FABRICATED REPAIR DOUBLER & LOCATED, DRILLED HOLES IN REPAIR PARTS IAW SRM 57-10-10-2R-5. VISUAL INSPECTION ACCOMPLISHED ON PARTS FABRICATED. REPAIRED ATTACH ANGLE IAW SRM 57-10-10-2R-5 & M-24-157-02340.