What was found
H.F.E.C. VERIFIED BS 663 VAPOR BARRIER ATTACH ANGLE CRACKED APPROX. LBL 9.<[01] REMOVED ALL FASTENERS ON L/H VAPOR BARRIER ATTACH ANGLE IN FUEL TANK PER SRM 57-10-10-2R-5. REMOVED ALL FASTENERS ON VERTICAL FLANGE OF THE VAPOR BARRIER ATTACH ANGLE FROM APPROXIMATELY LBL 5' TO LBL 65' PER SRM 51-40-02. REMOVED L/H VAPOR BARRIER ATTACH ANGLE FROM APPROXIMATELY LBL 5' TO LBL 65' PER SRM 51-40-02. LOCATED; DRILLED; AND DEBURRED NEW REPLACEMENT LH VAPOR BARRIER ATTACH ANGLE PER SRM 51-40-05. REMOVED AND REPLACED NEW VAPOR BARRIER ATTACH ANGLE FROM LBL 5 TO LBL 65 PER SRM 51-40-02; EA-M-24-157-02340 AND DRAWING 111A1000.