What was found
RH O/B AFT FLAP HAS DELAMINATION AT I/B END ALONG T/E<[01] RECIEVED NEW R/W O/B AFT FLAP. INSTALLATION OF AFT FLAP TO BE ACCOMPLISHED ON FAULT TTG8Q01BR0YJ;[02] VERIFIED CORRECTIVE ACTION STEP 1.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RH O/B AFT FLAP HAS DELAMINATION AT I/B END ALONG T/E<[01] RECIEVED NEW R/W O/B AFT FLAP. INSTALLATION OF AFT FLAP TO BE ACCOMPLISHED ON FAULT TTG8Q01BR0YJ;[02] VERIFIED CORRECTIVE ACTION STEP 1.