What was found
LEFT A/C BAY, BS 663 LBL 35, VAPOR BARRIER ANGLE WAS CRACKED. CUT AND REMOVED DAMAGED SECTION OF BS 663 VAPOR BARRIER ATTACH ANGLE FROM APPROX LBL35 TO LBL65 IAW SRM 57-10-10-2R-5. LOCATED HOLES ON VAPOR BARRIER REPLACEMENT ANGLE IAW SRM 57-10-10-2R-5. LOCATED HOLES ON VAPOR BARRIER REPLACEMENT ANGLE IAW SRM 57-10-10-2R-5. MATCH DRILLED REPLACEMENT ANGLE & FABRICATED REPAIR DOUBLER IAW SRM 57-10-10-2R-5, MATCH DRILLED REPLACEMENT ANGLE & FABRICATED REPAIR DOUBLER IAW SRM 57-10-10-2R-5. INSTALLED LT VAPOR BARRIER REPLACEMENT ANGLE AND DOUBLER FUEL TANK FASTENERS AT BS 663 IAW SRM 57-10-10-2R-5. ONLY FASTENERS COMMON TO THE FUEL TANK WERE INSTALLED. .CAP SEALED INTERNAL FUEL TANK FASTENERS AT BS 663 REPLACEMENT ANGLE AND REPAIR DOUBLER IAW SRM 57-10-10-2R-5 AND SRM 51-80-01 AT 22:45PM. INSTALLED VAPOR BARRIER REPLACEMENT ANGLE & SPLICE DOUBLER LOWER LEG FASTENERS AT BS 663 IAW SRM 57-10-10-2R-5. CAP SEALED EXTERNAL SURFACE OF REPAIR FASTENERS & FAY SEALED REPAIR PARTS IAW SRM 57-10-10-2R-5.