What was found
THERE ARE THREE FASTENER HOLES ELONGATED ON THE REPAIR AREA, UNABLE TO PERFORM NDT BOLT HOLE INSPECTION, ON THE VAPOR BARRIER BS 661-95, LBL 34.79, THERE ARE 3 FASTENER HOLES ELONGATED ON THE REPAIR AREA UNABLE TO PERFORM NDT BOLT HOLE INSPECTION ON THE VAPOR BARRIER BS 661-95, LBL 34.79. DRILLED FASTENER HOLES TO NEXT LARGER SIZE IAW SRM 51-40-02.