What was found
DURING SCHEDULED D CHECK, FOUND FLOOR SUPPORT CRACKED AT BS 540, BL 0 TO RBL 25. REPLACED PER BOEING STRUCTURAL REPAIR MANUAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND FLOOR SUPPORT CRACKED AT BS 540, BL 0 TO RBL 25. REPLACED PER BOEING STRUCTURAL REPAIR MANUAL.