What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CRACKED AT BS 277, S16L AND FRAME SHEAR TIE CRACKED AT BS 460, RBL 6. REPAIRED PER BOEING STRUCTURAL REPAIR MANUAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CRACKED AT BS 277, S16L AND FRAME SHEAR TIE CRACKED AT BS 460, RBL 6. REPAIRED PER BOEING STRUCTURAL REPAIR MANUAL.