What was found
DURING SCHEDULED D-CHECK, FOUND FUSE FRAME CRACKED AT FASTENER HOLES AT S3L, 2L, 1L, 2R AND 3R. REPAIRED PER BOEING STRUCTURAL REPAIR MANUAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSE FRAME CRACKED AT FASTENER HOLES AT S3L, 2L, 1L, 2R AND 3R. REPAIRED PER BOEING STRUCTURAL REPAIR MANUAL.