What was found
DURING SCHEDULED TRANSITION CHECK, FOUND THRESHOLD TIE STRAP CORRODED FROM BS 787 TO 847, RBL 21, WL 154. REPAIRED PER BOEING STRUCTURAL REPAIR MANUAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED TRANSITION CHECK, FOUND THRESHOLD TIE STRAP CORRODED FROM BS 787 TO 847, RBL 21, WL 154. REPAIRED PER BOEING STRUCTURAL REPAIR MANUAL.