What was found
DURING SCHEDULED 1/2 D CHECK, FOUND WEB CRACKED AT LIGHTENING HOLE ON TOP SIDE OF APU CAVITY. INSTALLED WEB REPAIR PER BOEING STRUCTURAL REPAIR MANUAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2 D CHECK, FOUND WEB CRACKED AT LIGHTENING HOLE ON TOP SIDE OF APU CAVITY. INSTALLED WEB REPAIR PER BOEING STRUCTURAL REPAIR MANUAL.