What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME GOUGED AT BS 294.5, RIGHT SIDE AT S4R. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME GOUGED AT BS 294.5, RIGHT SIDE AT S4R. REPAIRED PER BOEING SRM.