What was found
DURING SCHEDULED D-CHECK, FOUND FLOOR BEAM CORROSION AT BS 344 LBL 35 LBL 7.5 BL 0 AND RBL 1.5. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FLOOR BEAM CORROSION AT BS 344 LBL 35 LBL 7.5 BL 0 AND RBL 1.5. REPAIRED PER BOEING SRM.