What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME DENTED AT BS 500A, RBL 44 AND RBL 52 TO 56, WL 168, 179 TO 177. REPLACED WITH NEW SECTION PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME DENTED AT BS 500A, RBL 44 AND RBL 52 TO 56, WL 168, 179 TO 177. REPLACED WITH NEW SECTION PER BOEING SRM.