What was found
DURING SCHEDULED 1/2 D-CHECK, FOUND FLOOR BEAM CORROSION IN AND AROUND FWD FLANGE AT RBL 15 AND 45, BS 986.5. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2 D-CHECK, FOUND FLOOR BEAM CORROSION IN AND AROUND FWD FLANGE AT RBL 15 AND 45, BS 986.5. REPAIRED PER BOEING SRM.