What was found
DURING SCHEDULED D-CHECK, FOUND FLOOR BEAM CORROSION AT BS 344, LBL 28. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FLOOR BEAM CORROSION AT BS 344, LBL 28. REPAIRED PER BOEING SRM.