What was found
DURING SCHEDULED D-CHECK, FOUND FLOORBEAM UPPER FLANGE CORROSION AT BS 986.5 RBL 37 LBL 5 WL 208. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FLOORBEAM UPPER FLANGE CORROSION AT BS 986.5 RBL 37 LBL 5 WL 208. REPAIRED PER BOEING SRM.