What was found
DURING SCHEDULED D-CHECK, FOUND FLOOR BEAM CORRODED AT BS 986.5, RBL 26, RBL 4-5, AND AT LBL 3-5, WL 208. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FLOOR BEAM CORRODED AT BS 986.5, RBL 26, RBL 4-5, AND AT LBL 3-5, WL 208. REPAIRED PER BOEING SRM.