What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CRACKED AT HAT SECTION ANGLE AT BS 907, BETWEEN S9 AND 8L, AND AT BS 400, BETWEEN S9 AND 8L. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CRACKED AT HAT SECTION ANGLE AT BS 907, BETWEEN S9 AND 8L, AND AT BS 400, BETWEEN S9 AND 8L. REPAIRED PER BOEING SRM.