What was found
DURING SCHEDULED D-CHECK, FOUND MOPSILL CORROSION AT BS 272 TO 333, WL 209, RBL 55. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND MOPSILL CORROSION AT BS 272 TO 333, WL 209, RBL 55. REPAIRED PER BOEING SRM.