What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME DENTED AT BS 807, LBL 27. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME DENTED AT BS 807, LBL 27. REPAIRED PER BOEING SRM.