What was found
DURING SCHEDULED 1/4 D CHECK, FOUND FLOORBEAM HAS 12 DOUBLE DRILLED HOLES FROM BS 420-440 RBL 13. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4 D CHECK, FOUND FLOORBEAM HAS 12 DOUBLE DRILLED HOLES FROM BS 420-440 RBL 13. REPAIRED PER BOEING SRM.