What was found
DURING SCHEDULED D-CHECK, FOUND CARGO FLOORBEAM CORROSION AROUND NUT PLATE LOCATIONS, BS 727 TO 947, RBL 7.5, WL 158. REMOVED FLOORBEAM AND INSTALLED NEW FLOORBEAM PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND CARGO FLOORBEAM CORROSION AROUND NUT PLATE LOCATIONS, BS 727 TO 947, RBL 7.5, WL 158. REMOVED FLOORBEAM AND INSTALLED NEW FLOORBEAM PER BOEING SRM.