What was found
DURING SCHEDULED D CHECK, FOUND GOUGE AT RT HORIZ STAB LEADING EDGE PANEL LE BS 149.75. REMOVED AND REPLACED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND GOUGE AT RT HORIZ STAB LEADING EDGE PANEL LE BS 149.75. REMOVED AND REPLACED PER BOEING SRM.