What was found
DURING SCHEDULED BC CHECK, FOUND SHEET METAL REPAIR TO AFT ENTRY DOOR AREA L1 DOOR RIG. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED BC CHECK, FOUND SHEET METAL REPAIR TO AFT ENTRY DOOR AREA L1 DOOR RIG. REPAIRED PER BOEING SRM.