What was found
DURING SCHEDULED D-CHECK, FOUND CRACKED FRAME PAX CABIN UPPER LOBE STRUCTURE LEFT HAND AT BS 727D BETWEEN STR 8 AND 9, BS 727D RIGHT HAND SIDE BETWEEN STR 8 AND 9 AND BS 747 RIGHT HAD SIDE BETWEEN STR 8 AND 9. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND CRACKED FRAME PAX CABIN UPPER LOBE STRUCTURE LEFT HAND AT BS 727D BETWEEN STR 8 AND 9, BS 727D RIGHT HAND SIDE BETWEEN STR 8 AND 9 AND BS 747 RIGHT HAD SIDE BETWEEN STR 8 AND 9. REPAIRED PER BOEING SRM.