What was found
DURING SCHEDULED D-CHECK, FOUND FRAME CRACKED AT HAT RACK ATTACH BRACKET BETWEEN STRINGERS 8R AND 9R AT BS 727B. REMOVED AND REPLACED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FRAME CRACKED AT HAT RACK ATTACH BRACKET BETWEEN STRINGERS 8R AND 9R AT BS 727B. REMOVED AND REPLACED PER BOEING SRM.