What was found
DURING SCHEDULED 1/2D CHECK, FOUND FRAME AT BS 294.5 CRACKED AT FLOOR LEVEL (FWD OF FWD SERVICE DOOR). REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FRAME AT BS 294.5 CRACKED AT FLOOR LEVEL (FWD OF FWD SERVICE DOOR). REPAIRED PER BOEING SRM.