What was found
DURING SCHEDULED 1/4D CHECK, FOUND CORRODED 3 DOME NUTS AT BS 468, BL 0 FUSELAGE. REMOVED AND REPLACED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND CORRODED 3 DOME NUTS AT BS 468, BL 0 FUSELAGE. REMOVED AND REPLACED PER BOEING SRM.