What was found
DURING SCHEDULED D CHECK, FOUND NR 1 PYLON I/B T/E L BRACKET SUPPORT CRACKED AT UPPER OF FLAP CUTOUT ON AFT PANEL SUPPORT. REMOVED AND REPLACED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D CHECK, FOUND NR 1 PYLON I/B T/E L BRACKET SUPPORT CRACKED AT UPPER OF FLAP CUTOUT ON AFT PANEL SUPPORT. REMOVED AND REPLACED PER BOEING SRM.