What was found
DURING SCHEDULED D-CHECK, FOUND CORROSION ON TOP FLANGE OF FLOORBEAM AT BS 947, RBL 44 TO RBL 53, WL 208. REMOVED AND REPLACED FLOORBEAM PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND CORROSION ON TOP FLANGE OF FLOORBEAM AT BS 947, RBL 44 TO RBL 53, WL 208. REMOVED AND REPLACED FLOORBEAM PER BOEING SRM.