What was found
DURING SCHEDULED D-CHECK, FOUND FUSE FRAME SHEAR TIES CRACKED AT BS 360, BETWEEN S13 AND 15L. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSE FRAME SHEAR TIES CRACKED AT BS 360, BETWEEN S13 AND 15L. REPAIRED PER BOEING SRM.