What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CORRODED AT BS 440, BETWEEN S25 AND 26R. REPLACED DAMAGED SECTION PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME CORRODED AT BS 440, BETWEEN S25 AND 26R. REPLACED DAMAGED SECTION PER BOEING SRM.