What was found
DURING SCHEDULED D-CHECK, FOUND CREASE BEAM WEB BODY CORRODED AT BS 1002, WL 208, RBL 49. INSTALLED NEW WEB PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND CREASE BEAM WEB BODY CORRODED AT BS 1002, WL 208, RBL 49. INSTALLED NEW WEB PER BOEING SRM.